Land to
build-ready.
From your design vision to council ready in 12 weeks, without delays, confusion or builder back-and-forth.
Everything before
the builder.
- 01
Reports and site due diligence
Survey and consultant management, so we know your land before we design.
- 02
Concept design
Tailored to your land, from your design brief.
- 03
Construction plans
Your construction drawings, prepared from the concept you sign off.
- 04
Engineering and energy documentation
Slab, structural and energy documentation, completed after your plans are signed off.
- 05
Council submission
Everything made ready for submission, with a town planner local to your area.
From deposit
to submission.
- 1First 24 hours
Project setup. Boundary and contour survey plus geotechnical testing are booked.
- 2Weeks 1 to 3
Site appointments are completed and reports return. The drafting brief is prepared in parallel.
- 3Weeks 4 to 5
Initial coordinated architectural plans are issued, followed by the family design meeting.
- 4Weeks 5 to 8
Three included revision rounds refine and confirm the design before engineering.
- 5Weeks 8 to 10
Slab, structural and energy documentation are coordinated while the town planner reviews the pathway.
- 6Weeks 11 to 12
Final documentation is collated with the town planner and prepared for council submission.
Construction programmes involve people and external consultants, and occasional leave or unforeseen delays can occur. We work to a 12-week schedule.