The Barn Haus Pre-Construction Studio

Land to
build-ready.

From your design vision to council ready in 12 weeks, without delays, confusion or builder back-and-forth.

PackageDesign & Pre-Construction
TimelineCouncil ready in 12 weeks
InvestmentFrom $33,900 + GST
Scope

Everything before
the builder.

  1. 01

    Reports and site due diligence

    Survey and consultant management, so we know your land before we design.

  2. 02

    Concept design

    Tailored to your land, from your design brief.

  3. 03

    Construction plans

    Your construction drawings, prepared from the concept you sign off.

  4. 04

    Engineering and energy documentation

    Slab, structural and energy documentation, completed after your plans are signed off.

  5. 05

    Council submission

    Everything made ready for submission, with a town planner local to your area.

Twelve week programme

From deposit
to submission.

  1. 1
    First 24 hours

    Project setup. Boundary and contour survey plus geotechnical testing are booked.

  2. 2
    Weeks 1 to 3

    Site appointments are completed and reports return. The drafting brief is prepared in parallel.

  3. 3
    Weeks 4 to 5

    Initial coordinated architectural plans are issued, followed by the family design meeting.

  4. 4
    Weeks 5 to 8

    Three included revision rounds refine and confirm the design before engineering.

  5. 5
    Weeks 8 to 10

    Slab, structural and energy documentation are coordinated while the town planner reviews the pathway.

  6. 6
    Weeks 11 to 12

    Final documentation is collated with the town planner and prepared for council submission.

Construction programmes involve people and external consultants, and occasional leave or unforeseen delays can occur. We work to a 12-week schedule.